Oct 30, 20231 minSAFE REACHPIVOTING JIB BOOMCLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Mar 2, 20231 minDMS Primary Crusher (Sishen Iron Ore) JAD461 – Sishen DMS – Big Rock Detection System Anglo-American Kumba Iron Ore Sishen Mine approached us to assist in installing a big...
Oct 25, 20211 minDump Truck Bumper SolutionTo prevent LDV's from being trapped underneath a haul truck, we designed bumpers for 13 different trucks at two separate mining operations.
Oct 25, 20211 minA Fully Mechanised Mobile UnitThe planned dewatering of a mining area with boreholes up to 400m deep is conducted manually by uncoiling and recoiling the electrical...
Oct 25, 20211 minMaintenance on stockpilesSouth 32 Metalloys Meyerton experienced difficulties during the maintenance of their stockpiles. Continuous production is one of the...
Oct 25, 20211 minSafe access into a jig primary crusher apron feederWe were appointed to design a solution for safe access to the feeder. Our team’s solution was for a retractable walkway that slides...
Apr 8, 20211 minStockpile feeding a conveyor using an Apron Feeder.With no existing drawings and the feeder having a relatively custom design, we had the task of re-engineering the feeder with limited and...