FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


DMS Primary Crusher (Sishen Iron Ore)
JAD461 – Sishen DMS – Big Rock Detection System Anglo-American Kumba Iron Ore Sishen Mine approached us to assist in installing a big...
Mar 2, 20231 min read
88 views

Dump Truck Bumper Solution
To prevent LDV's from being trapped underneath a haul truck, we designed bumpers for 13 different trucks at two separate mining operations.
Oct 25, 20211 min read
50 views

A Fully Mechanised Mobile Unit
The planned dewatering of a mining area with boreholes up to 400m deep is conducted manually by uncoiling and recoiling the electrical...
Oct 25, 20211 min read
39 views

Maintenance on stockpiles
South 32 Metalloys Meyerton experienced difficulties during the maintenance of their stockpiles. Continuous production is one of the...
Oct 25, 20211 min read
10 views

Safe access into a jig primary crusher apron feeder
We were appointed to design a solution for safe access to the feeder. Our team’s solution was for a retractable walkway that slides...
Oct 25, 20211 min read
42 views

Stockpile feeding a conveyor using an Apron Feeder.
With no existing drawings and the feeder having a relatively custom design, we had the task of re-engineering the feeder with limited and...
Apr 8, 20211 min read
106 views