top of page
FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


North Concentrator DAF Tank
JAD was tasked with designing a take-off tank at Anglo Platinum’s Mogalakwena Mine, particularly by the North Concentrator. The tailings...
May 10, 20231 min read
89 views

Cell Froth Sensors (Quellaveco Peru)
Anglo American’s flagship mine, Peru Quellaveco Copper Mine, approached JAD Design & Draughting to assist with modelling a total of 76...
Apr 5, 20231 min read
56 views


DMS Primary Crusher (Sishen Iron Ore)
JAD461 – Sishen DMS – Big Rock Detection System Anglo-American Kumba Iron Ore Sishen Mine approached us to assist in installing a big...
Mar 2, 20231 min read
88 views

Feed Hopper & Conveyor
Our client requested to feed an existing conveyor system with a standby hopper in the case of maintenance on the current stockpile. Not...
Nov 30, 20211 min read
87 views

Analysing & Design of Conveyor
A 24m long conveyor was assessed to determine if its structural elements would be able to support the additional loading of a newly...
Oct 25, 20211 min read
28 views

40-ton Apron Feeder Chute Project
We're currently busy with the detailing and manufacturing drawings of this 40-ton apron feeder chute. We can't wait to share the full...
Oct 25, 20211 min read
63 views

Structural Design Project Highlights!
DMS Distribution Tank and Walkway Design JAD had the task to design a new support structure for an existing installation where some pipes...
Oct 25, 20211 min read
32 views

Design & Manufacturing of an Overland Chute
The head chute of an 1800mm wide conveyor belt feeding a DMS stockpile experienced unwanted material build-up and had to be redesigned....
Oct 25, 20211 min read
30 views

Training Centre Roof Simulation
The training centre had containers/simulators in a large area that had to be covered with a roof. Our design team, headed by our Senior...
Oct 25, 20211 min read
15 views

Hydraulic Cylinder Design
A diverter chute hydraulic cylinder was designed by one of our Senior Mechanical Draughtsmen, complete with detailed drawings for...
Oct 25, 20211 min read
23 views

Maintenance on stockpiles
South 32 Metalloys Meyerton experienced difficulties during the maintenance of their stockpiles. Continuous production is one of the...
Oct 25, 20211 min read
10 views

Stockpile feeding a conveyor using an Apron Feeder.
With no existing drawings and the feeder having a relatively custom design, we had the task of re-engineering the feeder with limited and...
Apr 8, 20211 min read
106 views
bottom of page