FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


North Concentrator DAF Tank
JAD was tasked with designing a take-off tank at Anglo Platinum’s Mogalakwena Mine, particularly by the North Concentrator. The tailings...
May 10, 20231 min read
89 views

TMM Inspection Facility for Anglo-American Kumba Iron Ore
Anglo-American Kumba Iron Ore employed JAD to assist with the design, draughting, procurement, and manufacturing of a vehicle inspection...
Apr 20, 20231 min read
67 views


DMS Primary Crusher (Sishen Iron Ore)
JAD461 – Sishen DMS – Big Rock Detection System Anglo-American Kumba Iron Ore Sishen Mine approached us to assist in installing a big...
Mar 2, 20231 min read
88 views


El Soldado Mine Bulk Measuring Project
The task was to design a new portal structure for the Particle Size Analysing (PSA) system at Anglo-American El Soldado Mine. 3D Scanning...
Nov 19, 20221 min read
124 views

Access Platform and Stairs on Primary Crusher Control Room Roof
Large objects sometimes get wedged inside the primary crusher; the need arose to scan the loads dumped into the crusher. Our team created...
Nov 18, 20221 min read
119 views

UHDMS Plant Particle Analysers (Geo Scan)
JAD was brought the challenge of assisting our client, Anglo-American Kumba Iron Ore Sishen Mine, with designing a support frame (with...
Nov 18, 20221 min read
133 views


Office Revamp Anglo Sishen
After already working on office revamps, Anglo-American approached us to revamp their engineering, geology, and surveying offices at...
Nov 18, 20221 min read
68 views

El Soldado - Sizer while Tipping
One of our most exciting projects is the Particle Size Analyser (PSA) system at the El Soldado Mine in Chile! Our scope included working...
Nov 18, 20221 min read
32 views


Jig Primary Crusher (Sishen Iron Ore)
Anglo American Kumba Iron Ore Sishen Mine, approached us to assist in installing a big rock detection system at their Jig Primary...
Nov 18, 20221 min read
79 views

Lamella Clarifier Tank Module Replacement
Our client contacted us for the design of the lamella frame/basket. The first step was to do a structural assessment of statuary...
Feb 7, 20221 min read
135 views

Structural Design Project Highlights!
DMS Distribution Tank and Walkway Design JAD had the task to design a new support structure for an existing installation where some pipes...
Oct 25, 20211 min read
32 views

Training Centre Roof Simulation
The training centre had containers/simulators in a large area that had to be covered with a roof. Our design team, headed by our Senior...
Oct 25, 20211 min read
15 views

A Canopy Structure Under a Conveyor Belt
The canopy structure, a safety roof preventing falling ore damaging vehicles passing under the conveyor belt, was designed and modelled...
Jan 15, 20211 min read
98 views

Introducing the Amandelbult Hospital Project
JAD Design & Draughting and Collaborit Asset Management Engineering assist South Africa in the COVID-19 pandemic. The COVID-19 pandemic...
Dec 19, 20201 min read
115 views

A Maintenance Frame For Sishen Iron Ore
Our client was doing maintenance on their DMS crusher shafts. Because no work under a suspended load is allowed, we had to develop a...
Nov 21, 20201 min read
84 views