FEATURED PROJECT
Oct 30, 20231 min read
PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Search
Mar 2, 20231 min read
DMS Primary Crusher (Sishen Iron Ore)
JAD461 – Sishen DMS – Big Rock Detection System Anglo-American Kumba Iron Ore Sishen Mine approached us to assist in installing a big...
82 views
Nov 19, 20221 min read
El Soldado Mine Bulk Measuring Project
The task was to design a new portal structure for the Particle Size Analysing (PSA) system at Anglo-American El Soldado Mine. 3D Scanning...
122 views
Nov 18, 20221 min read
Access Platform and Stairs on Primary Crusher Control Room Roof
Large objects sometimes get wedged inside the primary crusher; the need arose to scan the loads dumped into the crusher. Our team created...
114 views
Nov 18, 20221 min read
UHDMS Plant Particle Analysers (Geo Scan)
JAD was brought the challenge of assisting our client, Anglo-American Kumba Iron Ore Sishen Mine, with designing a support frame (with...
133 views
Nov 18, 20221 min read
Office Revamp Anglo Sishen
After already working on office revamps, Anglo-American approached us to revamp their engineering, geology, and surveying offices at...
68 views
Nov 18, 20221 min read
Jig Primary Crusher (Sishen Iron Ore)
Anglo American Kumba Iron Ore Sishen Mine, approached us to assist in installing a big rock detection system at their Jig Primary...
79 views
Oct 25, 20211 min read
3D Scanning for South32
Our client, South 32, requested to verify a newly fabricated hood for their Arc Furnace. Due to the short shutdown time and enormous...
47 views