PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Search
Oct 30, 20231 min read
PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
54
Oct 30, 20231 min read
TRUCK BED ANCHOR TRACK
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 3 months SCOPE OF WORK: Safe Access SECTOR: Mining...
53
Oct 30, 20231 min read
HAUL TRUCK TRAY ACCESS PLATFORM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 3 months SCOPE OF WORK: Safe Access SECTOR: Mining...
46
Oct 30, 20231 min read
CONVEYOR HEAD TRAVELLING BRIDGE
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
27
Oct 30, 20231 min read
CHUTE LINER REPLACEMENT ANCHOR POINTS
CLIENT: Vedanta SCALE: n/a PROJECT DURATION: 1 month SCOPE OF WORK: Safe Access SECTOR: Mining Industry...
27
Oct 30, 20231 min read
CONVEYOR ACCESS ANCHOR TRACK
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 3 months SCOPE OF WORK: Safe Access SECTOR: Mining...
8
May 25, 20231 min read
JAD Water Treatment Plant
JAD, together with WEC Projects, was tasked with the design and draughting of a 15 000 000-litre/day water treatment plant. This included...
239
May 19, 20231 min read
WEC Container Plants
JAD partnered with WEC Projects to complete four (4) wastewater treatment plants destined for Guinea. WEC Projects has vast experience in...
69
May 10, 20231 min read
North Concentrator DAF Tank
JAD was tasked with designing a take-off tank at Anglo Platinum’s Mogalakwena Mine, particularly by the North Concentrator. The tailings...
84
Apr 28, 20231 min read
JAD Discrete Element Modeling Capabilities
Chirodzi Mine in Mozambique required assistance with the design of one of their transfer chutes, so they requested JAD to undertake a...
75
Apr 20, 20231 min read
TMM Inspection Facility for Anglo-American Kumba Iron Ore
Anglo-American Kumba Iron Ore employed JAD to assist with the design, draughting, procurement, and manufacturing of a vehicle inspection...
67
Apr 5, 20231 min read
Cell Froth Sensors (Quellaveco Peru)
Anglo American’s flagship mine, Peru Quellaveco Copper Mine, approached JAD Design & Draughting to assist with modelling a total of 76...
50
Mar 2, 20231 min read
DMS Primary Crusher (Sishen Iron Ore)
JAD461 – Sishen DMS – Big Rock Detection System Anglo-American Kumba Iron Ore Sishen Mine approached us to assist in installing a big...
82
Nov 19, 20221 min read
El Soldado Mine Bulk Measuring Project
The task was to design a new portal structure for the Particle Size Analysing (PSA) system at Anglo-American El Soldado Mine. 3D Scanning...
122
Nov 18, 20221 min read
Access Platform and Stairs on Primary Crusher Control Room Roof
Large objects sometimes get wedged inside the primary crusher; the need arose to scan the loads dumped into the crusher. Our team created...
114
Nov 18, 20221 min read
UHDMS Plant Particle Analysers (Geo Scan)
JAD was brought the challenge of assisting our client, Anglo-American Kumba Iron Ore Sishen Mine, with designing a support frame (with...
133
Nov 18, 20221 min read
Office Revamp Anglo Sishen
After already working on office revamps, Anglo-American approached us to revamp their engineering, geology, and surveying offices at...
68
Nov 18, 20221 min read
El Soldado - Sizer while Tipping
One of our most exciting projects is the Particle Size Analyser (PSA) system at the El Soldado Mine in Chile! Our scope included working...
31
Nov 18, 20221 min read
Jig Primary Crusher (Sishen Iron Ore)
Anglo American Kumba Iron Ore Sishen Mine, approached us to assist in installing a big rock detection system at their Jig Primary...
79
Mar 11, 20221 min read
Peru: Air Curtain Project
The client, Anglo American Quellaveco Mine, approached us to design a PSA crusher air ducting system for a mine in South America. The...
166