top of page

Structural Design Project Highlights!

DMS Distribution Tank and Walkway Design


JAD had the task to design a new support structure for an existing installation where some pipes collapsed. With the help of Procon, a design was done to get the best possible solution for this congested installation.


Canopy Under a Conveyor Belt


We had the task to design a solution preventing material from falling onto vehicles passing underneath the conveyor. Our engineers made the design analysis on Procon, but also involved the University of Stellenbosch to give their input with the IBR fixing method.



Comments


bottom of page