South 32 Metalloys Meyerton experienced difficulties during the maintenance of their stockpiles.
Continuous production is one of the leading factors in this industry, and therefore our team developed the following solution:
To ensure continuous supply, a bypass system was designed, consisting of a manually loaded hopper with a transfer conveyor feeding the main line.
Commentaires