CLIENT: Vedanta
SCALE: n/a
PROJECT DURATION: 1 month
SCOPE OF WORK: Safe Access
SECTOR: Mining Industry
STANDARDS: BS EN 363 / BS EN 795
PROJECT DESCRIPTION:
JAD Safe Reach assisted with the fitment of anchor points at two new feed chutes at Vedanta Mine. With the fitment of the anchor points, inspection and replacement of the liners within the chutes can be carried out safely. During the analysis of the anchor points, it was recognized that additional gussets would need to be fitted around the anchor points on the chutes for them to meet the relevant safety requirements.
From risk identification to safety device fitment, whether it be new structures or fitment to existing structures. JAD Safe Reach covers the complete scope for all your safe access requirements.