The planned dewatering of a mining area with boreholes up to 400m deep is conducted manually by uncoiling and recoiling the electrical cable, a huge safety risk for all personnel involved.
Our solution is a fully mechanised mobile unit that can wind a cable of up to Ø60 x 400m long, utilising a petrol engine that drives a hydraulic pump. This project confirms our commitment to teamwork, safety, and always meeting our client’s needs.
A Brilliant solution for Sishen Iron Ore!
Comments